Many major structures form the Metropolitan
Water District’s
(MWD) huge new project south and east of Los Angeles, CA. Geosystems
has been involved in the East Side Dam and also in the Arrowhead East
Tunnel.
On the former, Geosystems was engaged by MWD to help successfully defend
against a claim from the contractor who conducted the foundation drilling
and grouting. On the tunnel project, at different times, Geosystems was
employed as a subconsultant to Bechtel, and directly by the Legal Department
of MWD. Services on this project included:
Review of contractor’s detailed proposals.
Analysis of grouting
progress and execution.
Commentary on several issues related
to the Specification.
Contact
Dr. Peter T. Yen
Engineering Specialist
Bechtel Corporation
50 Beale Street
San Francisco, CA 94119-3965
(415) 768-7438 pyen@bechtel.com
Technical Papers
Bruce, D.A., A. Naudts, and W.G.
Smoak. (1998). “High
Flow Reduction in Major Structures: Materials, Principles, and Case Histories,” Grouts
and Grouting: A Potpourri of Projects. Proceedings of Sessions of Geo-Congress
98, American Society of Civil Engineers, Geotechnical Special Publication
No. 80, Boston, MA, October 18-21, pp. 156-176.
Nicholson, P.J. and D.A. Bruce.
(1996). “Jet Grouted
Envelope for Soft Ground Tunnel,” Proc. of North American Tunneling ‘96”,
Ed. by Ozdemir, A.A. Balkema, Rotterdam, pp. 395-400.
Bruce, D.A., Luttrell, E.C. and
Starnes, L.J. (1993). “Remedial
Grouting using Responsive Integrationsm.” Proc. ASDSO 10th Annual
Conference, Kansas City, MO, September 26-28, 13 pp. Also in Ground
Engineering 27 (3), April, pp.23-29.
PO Box 237 :: Venetia PA :: 15367
| tel.724.942.0570 fax. 724.942.1911